Can the same FIBC filling machine handle both powder and granules?
The frame and weighing system may cover more than one material, but the feeder, spout, dust control and operating settings must be checked for each product. Share the properties and required output of every material before a common configuration is proposed.
What determines the required installation height?
The upstream feeder, weighing arrangement, filling spout, bag height, lifting travel and take-away method all affect the overall height. A site section or measured clearance is needed before the layout is confirmed.